Compression Molding Machine for Urea Toilet Seat Cover

Sales Compression Molding Machine for Urea Toilet Seat Cover

Toilet seat cover molding machine: production of sanitary, urea toilet cover, urea toilet seat etc.

  • Support Service : Life-time Service
  • Trainning Service : Yes
  • Machine Weight : 12000KG
  • Machine Dimension : 2.6*1.5*3.2 M

Product Detail  

Urea Toilet Seat Making Machine

1. Intelligent operation, humanized panel

2. The process can be adjusted arbitrarily, and the software can be upgraded for free

3. All functional parameters can be set on the screen to reduce the rejection rate

4. Stable performance, low failure rate, speed, pressure, deflation times, molding time and various molding modes, molding process can be set on the screen, various molding modes, ready to use

5. The machine parts adopt well-known international brands, which is convenient for maintenance

6. Low barriers for workers


UF toilet seat cover making machine and moulds


Technical Parameters

No.

Content

DTB 600

1

Maximum Working Pressure

210kg/cm2

2

Main Cylinder Piston Diameter

Ø600mm

3

Auxiliary Cylinder

Shaft Ø50/pressure 12T

4

Main Cylinder Working Stroke

600mm

5

Adjustable Table Distance

600~900mm

6

Tension Column (Heat Treatment Grinding)

Ø165*2692mm

7

Oil Hydraulic Pump

21Mpa

8

Motor Specifications 

15HP

9

Heating Sheet Total Power

20.4KW

10

Machine Total Power

31.7KW

■PS: Specifications subject to change without notice


UF toilet seat and Cover molding machine


FAQ

1. Are you a factory? where is it?

Yes, Shunhao Factory is specialized in the production of melamine molding machines, urea toilet seats, and cover molding machines, preheating machines, toilet cover molds, and melamine molds.


2. What are the payment terms?

LC, TT, which can be negotiated.


3. What is the packaging of the UF toilet seat and cover molding machine? How to ship it?

It is recommended to transport the whole cabinet (FCL=FULL CONTAINER LOAD), film packaging, use wood to fix the four corners of the base to prevent movement; then thicken the wire; the zipper fixed in the container.


4. Can your engineers come to assist with machine installation and commissioning?

Sure, our engineers will go to your country to help and you will be responsible for the round-trip airfare and accommodation costs. Within 7 days, the salary of the engineer is paid by SHUNHAO.


Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
X

Home

Supplier

Leave a message

Leave a message

If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.